Services
Discover our high-performance underground mining assets: efficient, mobile, and versatile. Benefit from shorter lead times and cost-effective solutions to boost productivity and minimize downtime.
Choose from a range of design configurations, each crafted to excel in different underground applications.
2 X HFX Bolter Arrangement
This high-performance Multibolter delivers rapid and consistent bolting, accelerating project timelines and minimizing downtime. Its mobility and versatility make it ideal for a wide range of applications, ensuring it exceeds expectations.
Our Mobile Bolter, nimble and designed for on-the-go performance, strengthens underground operations. Ensures peak performance and easy relocation when required.
Specifically designed to excel in providing secondary support. Engineered to navigate and ensure top-notch performance and effortless relocation when needed.
- Low or high seam options available.
- Cable feeder options available.
- Site Specific design modifications available to ensure bolt pattern is achieved.
The secondary support unit offers unmatched efficiency and safety for your underground operations.
Engineered for exceptional roof and rib bolting capability, providing a comprehensive solution to enhance stability and safety in diverse geological conditions in wider roadways.
- High and low seam options available
- Extendable platforms for wider roadways
- Cable feeder Options available
Invest in our cost-effective bolter unit to ensure the reliability and safety of your mining projects.
Design Specific
Specifically designed for roof and rib bolting, our unit ensures secure and reliable support in the most demanding underground conditions.
Roadway Specific
Designed specifically for your roadway ensures compliance with each sites support rules.
Ergonomics
Engineered with ergonomics in mind, enhance operator comfort and safety, reducing fatigue and improving efficiency during operations.
3 x Boom
12 Week lead time- $200,000 upfront for site specific modification. Upfront costs will be reduced off the hire.
- Minimum 18 month hire
4 x Boom
16 week lead time- $500,000 upfront for site specific modification. Upfront costs will be reduced off the hire.
- Minimum 18 Month hire.
Join the many satisfied clients who have transformed their underground operations with our top-of-the-line equipment. Whether you’re breaking new ground or maintaining existing infrastructure, our hire solutions are designed to propel your project forward.
Ready to elevate your underground operations? Contact us today to learn more about our equipment options and how we can support your next project. Your success starts with the right tools—let’s make it happen together.